Inyo County
Water Department

Revegetation Plan continued:
Appendix III.  Field Protocol for Line-Point Transects

Equipment List
     -100 m tape
     -pencil, clipboard, and data sheets
     -camera
     -plastic bags for plant collection

Methods

All sites will be outfitted with permanent transect posts for measuring
vegetation cover and composition. Readings will require stretching a
100 m tape between permanent posts and recording live hits every 0.5
m "point". A live hit will be recorded when any living portion of a plant
is intercepted under a point. Point intervals may vary between sites or
may change as a result of data analysis. The plant will be identified to
species and whether it was planted as part of the revegetation project.
All plant species that are observed on the site but not encountered
along the transects will also be noted on data sheets. Unknown
species will be collected for identification.

In addition to data collection, observers will also note any need for
management activities such as fence repair, weed control, or
replanting.

Permanent photo points will be located at each site and pictures will
be taken when transects are run.

Continued on next page